Villa FORI TLU CUCCU on the SEA OF PUGLIA - PRIVATE POOL | Villa in Carovigno
4 Bedroom Villa in Pantanagianni-pezze Morelli, Carovigno
Villa in White Stone and Yellow Tuff, just renovated with all possible comforts
Beautiful Villa near the sea with all comforts.
There are 3 verandas, in stone and wood, the garden is enchanting, the oval-shaped swimming pool is 11 meters long and 6 meters wide but there is also a perfect beach to enjoy the sun in the dry bath.
The villa is equipped with a heated floor system for the winter with independent thermostats for each room and bathrooms included.
The air conditioning system is also independent in each room.
There are 4 bedrooms for 8 adults, and each room has its own private bathroom with shower.
From the kitchen and the living room you can see the magnificent swimming pool and the garden.
The property is completely fenced with a high boundary wall, it is safe and out of sight, equipped with a controlled alarm and connected from the outside with 3 private car parks inside, you can enjoy maximum privacy.
The sea is just 300 meters down the road, a 3 minute walk.
Villa FORI TLU CUCCU on the SEA OF PUGLIA - PRIVATE POOL is located in Pantanagianni-pezze Morelli. Villa FORI TLU CUCCU on the SEA OF PUGLIA - PRIVATE POOL provides accommodation, featuring Kitchen, Laundry, Ocean View, among other amenities. This Villa features Air Conditioner, Parking and Pool to make your stay a comfortable one.
Villa FORI TLU CUCCU on the SEA OF PUGLIA - PRIVATE POOL has 4 Bedrooms , 4 Bathrooms, and max occupancy of 8 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated Villa because of the excellent services rendered by the owner or manager of this Villa, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Villa has a friendly neighborhood, and the Pantanagianni-pezze Morelli has interesting places to visit. If you want to learn more about the Villa in Pantanagianni-pezze Morelli, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Air conditioning
-
Heating
-
Shower
-
Towels provided
-
Soap
-
4 bathrooms
-
Toilet paper
-
Bidet
-
Hair dryer
-
4 bedrooms
-
Sofa bed
-
Bed sheets provided
-
Dining table
-
Living room
-
Dishwasher
-
Electric kettle
-
Coffee/tea maker
-
Refrigerator
-
Coffee grinder
-
Stovetop
-
Microwave
-
Oven
-
Ice maker
-
Washing machine
-
Near the beach
-
Onsite parking options include a garage
-
Car recommended
-
Electric car charging station on site
-
Onsite parking
-
No pets allowed
-
If you have requests for specific accessibility needs, please contact the property using the information on the reservation confirmation received after booking.
-
Smoke-free property
-
Wheelchair accessible
-
Ecotours nearby
-
Windsurfing nearby
-
Cycling nearby
-
Golf nearby
-
Horse riding nearby
-
Scuba diving nearby
-
Birdwatching nearby
-
Sailing nearby
-
Fishing nearby
-
Stereo
-
Smart TV with cable/satellite service
-
Unit size: 1507 sq ft (140 sq m)
-
English
-
Italian
-
Near the sea
-
Near the bay
-
Near the ocean
-
Computer monitor
-
Desk
-
Children's dinnerware
-
Babysitting service available
-
Travel crib
-
Highchair
-
Playground
-
Housekeeping (on request)
-
Iron/ironing board
-
Chef
-
Free WiFi
-
Outdoor furniture
-
Balcony
-
Barbecue grill
-
Garden
-
Fenced yard
-
Smoke detector not reported (host has not indicated whether there is a smoke detector on the property)
-
First aid kit
-
Deadbolt lock
-
Carbon monoxide detector not reported (host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector)
-
Outdoor pool
-
Private pool
-
Fence around the pool
-
Hot tub
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector with you on the trip host has not indicated whether there is a smoke detector on the property onsite parties or group events are strictly prohibited safety features at this property include a first aid kit and a deadbolt lock special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation
Reviews
FAQ's
Is this Pantanagianni-pezze Morelli villa pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
Does the Pantanagianni-pezze Morelli villa have a swimming pool?
Yes, this Pantanagianni-pezze Morelli villa has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in Pantanagianni-pezze Morelli villa?
Best-rates for the Pantanagianni-pezze Morelli villa starts from $411 per night with includes View, Accessibility, Fireplace/Heating, Guest Services, Internet, Kitchen, Laundry, Ocean View, Security/Safety, Bedding/Linens, Entertainment, Air Conditioner, Parking, Pool, Wellness Facilities, Barbecue/Outdoor Cooking, TV, Private Pool, Balcony/Terrace, Oceanfront, Child Friendly, Hot Tub with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is Pantanagianni-pezze Morelli villa a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this villa Good or guests have recommended them suitable for families. As reported by the owner or manager, the villa has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the Pantanagianni-pezze Morelli villa wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the Pantanagianni-pezze Morelli villa has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the Pantanagianni-pezze Morelli villa?
Based on the information reported by the owner or manager, the Pantanagianni-pezze Morelli villa indicates 1 day stay policy at this villa. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for Pantanagianni-pezze Morelli villa?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.